Confidentiality precludes the listing of many projects.
Buildings
High Rise Condominium & Hotel, Southern California
Prepared delay and causation analysis on delayed construction of a 21-story luxury hotel. Arbitration panel ruled in favor of our client.
Earthwork and Infrastructure Demolition Project, Colorado
Cost verification of a large demolition and earthwork project where more than 40 government buildings were demolished and their concrete foundations were removed. Analyses included contractor resource logistics, alleged differing site conditions and productivity evaluations.
Physical Sciences Building, University of California,
Santa Cruz, CA
Seattle University, Seattle,WA
High Rise Condominiums Project, Western WA
Southport Hotel, Renton, WA
Marriott Hotel, Belevue, WA
5th & Columbia Mark Tower, Seattle, WA
Infrastructure
Design/Build Freeway and Toll Road, California
Prepared written change orders accompanying Time Impact Analyses and damages calculations in accordance with contract and Caltrans specifications. Several change orders exceeded $5 million and included retaining walls, land slide remediation, differing site conditions, earthwork variances and utility relocations and drainage issues.
Self-Anchored Suspension Bridge Project, San Francisco-Oakland Bay Area, CA
Prepared cost and resource-loaded baseline CPM schedule using P5 / P6 software. Integrated schedules for more than 45 different suppliers and subcontractors over a 7-year period.
Runway Addition, FL
Provide cost verification of a differing site conditions claim filed by the prime contractor. Settlement reached in mediation.
Combined Highway and Railway Suspension Bridge, Hong Kong
Analyzed CPM schedules, performed schedule delay analyses including causation and assignment of responsibility.
Design/Build Freeway Project, UT
Acting as the construction manager: Evaluated and negotiated contractor change orders, monitored contractor progress and compliance with performance specifications, administered the contract.
Water Regeneration Pipeline, Southern CA
Prepared delay and causation analysis; wrote expert report. Dispute settled in mediation.
Natural Gas Pipeline, Bolivia
Analyzed CMP schedules, performed schedule delay analyses and productivity analysis.
Water Well Field & Pipeline Project, TX
Performed schedule delay analysis and presented results to public water utility. Results assisted utility in establishing a strategy to close the project out with the contractor.
Fiber Optic Cable Installation, CA
Conducted delay analysis, analyzed change orders and prepared expert report in support for litigation.
Fiber Optic Cable Design and Installation,
Northwest, USA
Performed delay and productivity analyses, quantified damages for owner-attributable impacts.
Communications Installation, CA, MA, PA
Performed schedule delay and causation analyses on three different fiber optic installation projects throughout the United States..
Industrial & Process
Industrial & Process
Water Desalination Processing Plant, Southern California
Performed delay and causation analysis and validation of contractor change orders and claims for delay damages.
Pharmaceutical Plant, Singapore
Determined cause and effect of alleged design defects upon planned construction schedule. Performed cumulative impact claim.
Polyethylene Terephthalate (PET) Projects
Analyzed CPM schedules, performed schedule delay analyses including causation and assignment of responsibility; assisted in preparing expert report.
Waste Water Treatment Plant, Arizona
Prepared delay and causation analysis for expansion of an existing WWTP to 25 MGD capacity, and conveyance piping system. Prepared expert report.
Hydrogen Plant, Canada
Reviewed and updated active CPM schedules and converted from bulk to systems installation detail including Level 4, pre-commissioning activities. Performed window delay analysis to establish delay causation, a forecast completion date and to assist in evaluating acceleration scenarios for potential early completion.
C5/C6 Isomerisation Complex, Trinidad
Prepared delay and productivity claims. Inefficiencies evaluated include underground obstructions, hazardous gas releases and owner interferences.
Off-Shore Oil Platform and Power Plant, Gulf of Mexico, Mexico
Performed disruption, cumulative impact and cost analyses in assisting contractor prepare a claim against the owner. Analysis included evaluation of contractor’s management and in complying with contract provisions during construction.